Lead times and delivery schedule
Current planning lead times by product line and what each stage takes.
| Item | Planning lead time | Notes |
|---|---|---|
| Parts in stock | Fast delivery | Courier or LTL |
| Blast wheel rebuild or exchange | 1 to 2 weeks | Exchange units available |
| Control panel or HMI upgrade | 4 to 8 weeks | Includes design, build, program and install |
| Standard deflash model | 10 to 14 weeks | DEF-DB, DEF-TMB, DEF-WMB, DEF-INDEX |
| Spinner hanger or table blast | 12 to 18 weeks | Custom hooks and fixtures add 2 weeks |
| Air blast booth | 12 to 16 weeks | Depends on recovery floor option |
| Plate and structural line | 16 to 24 weeks | Conveyors and ducting included |
Planning values, updated November 2026. Lead time starts at drawing approval. Read the delivery guide for what happens in each stage.