Total cost of ownership

Media, power, wear parts, labour and downtime: what a blast machine really costs per year.

By Surface Technologies engineering · Updated November 27, 2026 · 2 min read

Capital is a third

Over ten years the purchase price is typically a third of total cost. Media, wear parts, power and labour make up the rest, which is why wheel efficiency and separator quality matter more than the sticker.

Media

Steel shot consumption runs about 1 to 2 lb per hour per wheel horsepower in cleaning service. Good separation and the right operating mix cut this materially.

Wear parts

Blades, impellers, control cages and liners are consumables. Budget them per thousand hours and keep a set on the shelf; the guarantee program handles this.

Power

Wheel motors dominate. A four-wheel plate machine draws 60 to 80 kW while blasting; VFDs let you throttle for light work.

Downtime

A stalled blast machine stops everything downstream. The cost of one shift lost usually exceeds a year of preventative maintenance, which is the argument for the up-time guarantee.

Labour

Count the people who load, unload and attend the machine. Automation that removes handling often pays back faster than any saving on purchase price, and a machine that needs less attention frees an operator for other work.

Dust and waste disposal

Spent abrasive, scale and filter dust have to be collected and disposed of, and the cost depends on what was removed from the parts. Coatings containing regulated metals change the disposal route. Include it in the comparison.

Compressed air

Air blast processes consume a great deal of compressed air, which is one of the more expensive utilities in a plant. Where a wheel can do the work, the energy saving alone is significant over the life of the machine.

Comparing two quotations

Put both on the same basis: cost of the complete installed cell, expected abrasive and wear-part consumption per hour, power, labour and planned downtime. Then divide by parts per year. The machine with the higher price is frequently the one with the lower cost per part.

New or upgraded

An upgrade to the controls and wheels on existing equipment can reach the same cost per part for less capital, provided the cabinet is sound and the size still suits the work. It is worth asking for both options to be costed.