Shot blast line estimator
Rough-order-of-magnitude budget for a complete wheel blast cell, not just the machine. Pick a machine, size the wheels and add the pieces most plants forget. Figures are planning ranges in Canadian dollars; a firm quote needs a drawing.
Your line
Estimated line budget CAD, planning range
Range shown is roughly −15% to +25% of the estimate, which is how far planning budgets usually move once the part and the plant are known.
Figures are planning estimates in Canadian dollars. Your quote is based on your part, your volume and your plant.
Running cost per blast hour
Power, air, abrasive and wear parts, before labour and the dust collector.
Estimated running cost
Rules of thumb from Surface Technologies operating cost sheets: about 0.9 kW per wheel horsepower, shot use per wheel horsepower, wear parts about $0.05 per wheel horsepower per hour and air at $0.06 per CFM-hour. Carry-out on parts, part shape and upkeep change the result, and the hours you actually blast set the real cost. A blow-off or touch-up nozzle can use 170 CFM or more.
For example, a four-wheel roll conveyor machine with 25 HP wheels comes to about $59 a blast hour, and a four-wheel mesh belt with 60 HP of wheels to about $30.
